Clark Lawler owner of Dodger Industries was so impressed with the job over the offices that he decided to go ahead with the rest of the building, another 45,000 SQ. Ft.

Clark Lawler owner of Dodger Industries was so impressed with the job over the offices that he decided to go ahead with the rest of the building, another 45,000 SQ. Ft.

...

...

3_1038_300

All the fasteners were tightened or more added if needed.

After the fasteners were secure they were covered with WPM-9 to ensure a tight seal.

After the fasteners were secure they were covered with WPM-9 to ensure a tight seal.

...

...and the store completely repainted with Benjamin Moore Eggshell finish. All the work had to be done after the store closed and before it opened at 6:00am.

All the vertical and horizontal seams were taped with butyl back roofing tape.

All walls and columns at Aeropostale were taped, mudded, and sanded smooth. All new drywall was primed and painted.

7_1045_300

...

...

...

All the A/C units, stacks, and protrusions had to be taped where they met the roof for a water tight seal.

All doors were sanded where needed, primed and painted with oil based top coat at Longview Fibre.

Once the roofing tape was down it was all coated twice with Astecs WPM-9 Primer to lock it in.

Once the roofing tape was down it was all coated twice with Astecs WPM-9 Primer to lock it in.

...

...

...

...

...

...

The 45,000 SQ. FT. roof had 15,000 SQ. FT. of newer metal which was coated with Astec’s Conditioner to ensure a good seal for the top coat.  30,000 SQ. FT. of the roof was older and very rusty.

The 45,000 SQ. FT. roof had 15,000 SQ. FT. of newer metal which was coated with Astec’s Conditioner to ensure a good seal for the top coat. 30,000 SQ. FT. of the roof was older and very rusty.

...

...

Two coats of Astec’s B-16-71 Rust Inhibitor was applied to the entire 30,000 SQ. FT. to prevent the rust  from coming back through.

Two coats of Astec’s B-16-71 Rust Inhibitor was applied to the entire 30,000 SQ. FT. to prevent the rust from coming back through.

...

...

The first cost of the Astec 2000 Finish Coat was applied.

The first cost of the Astec 2000 Finish Coat was applied.

...

...

...

...

...

...

Second coat of Astec 2000 was then applied.

Second coat of Astec 2000 was then applied.

...

...

...

...

The final result is a completed 45,000 sq. ft. metal roof with the Astec System.

The final result is a completed 45,000 sq. ft. metal roof with the Astec System.

...

...

A ten year warranty for both labor and material was passed on to Clark.