m1

The Coralville United Methodist Church at 806 - 13th Ave in Coralville had numerous leaks throughout the EPDM roof.

m2

...

m3

...

m4

...

m5

All the seams, stacks, and vents were taped with butyl backed tape. Two coats of WPM # 9 primer and two coats of Astec’s 2,000 Finish coat were applied to these areas before the power washing to ensure that water could not damage the surfaces underneath.

m6

...

m7

...

m8

...

m9

The entire roof was then coated with Astecs 2000 finish coat twice.

m10

...

m11

Resulting in an energy efficient white roof with no leaks and a 10 year warranty on material and labor. John Austin could now be relieved in letting the board members know.

m12

...

m13

...